A- Water supply system 🚿

01- Water piping ppr, pex taken from ppr to fixtures inside conduit.

02- Chlorination for Water tanks to kill legionella.

03- Water tank storage based on occupancy type and demand per capita, minimum 24hr duration.

04- Pressure of water before meter maximum 2 bars.

05- No of meters per header in dewa meter room is 5.

06- minimum meter room size is 1.5×1.5x3m, door minimum width 0.8x2m.

07- Submeter to be provided for any use like irrigation/pool, when cooling load is 1MW or gross area of 5000m2 or more.

08- Filling point no more than 2m from ground level.

09- Condensate reuse if cooling load > 350kw.

10- Water velocity in pipe 1.5m.

B- Drainage System 💦

01- Most common 2 pipe system used (separate soil and waste piping).

02- Vent for 1st and last manholes.

03- Manholes spacing < 20m.

04- Cleanout spacing <12m.

05- Pipe slope 110mm is 1:60 , for 160mm is 1:90, for 200mm is 1:120.

06- For building <20 floors, separate last floor.

07- For building >20 floors, separate last 2 floors.

08- Minimum soil/waste stack size for building upto 7 floors is 100mm, for buildings >7floors is 150mm.

09- Minimum vent stack size for building upto 7 floors is 75mm, for buildings >7floors is 100mm.

10- Rain water free discharge in most cases, intensity 75mm/hr.

11- Manhole/gully trap inside building to be dry type.

12- Manhole sizes :

Depth upto 1.3m ‐——- 600x600mm

Depth 1.3 to 1.7m——- 800x800mm

Depth 1.7 to 2.5m —— 1m diameter

Depth 2.5 to 4m ——— 1.5m diameter

C- Fire Fighting 🔥

01- Separate piping for sprinklers and standpipe (wet risers).

02- Breaching inlets (siamese) one for sprinklers, one for wet risers, one for tank filling.

03- Fire station to be provided every 90m vertically.

04- Interconnection between fire risers for cabinets.

05- Alarm check valve only for sprinklers.

06- Loop for high zone for high rise building, low zone provided with PRV.

07- Novec system used for most of electrical rooms, only rooms with area >10m2 need automatic system.

08- Sprinklers to be provided in public toilets, not required for other toilets except upright above ceiling in case of heater provided.

09- Sprinkler provided in elevator pit, in ceiling more than 800mm void.

10- Pump room minimum size is

50gpm pump, 3x3m

100gpm pum0, 3x4m

500gpm pump, 4x4m

1500gpm pump, 5x6m

More than 1500gpm, 6x6m

Eng. Ali Hassan (PHF Engineer)

+10Years Experience

Www.fire-matrix.org

WhatsApp +201025012944